North American Lithium
- Safety performance at North American Lithium (NAL) was impacted by a number of musculoskeletal injuries that affected the total recordable injury frequency rate (TRIFR). NAL is responding by strengthening safety coaching, leadership visibility and critical risk controls.
- Ore mined increased by 25% quarter on quarter (QoQ) with a record 466,499 wet metric tonnes (wmt) mined. Total material mined increased by 12% QoQ as the operation moved into areas with thicker veins which reduced waste stripping and mining.
- Process plant utilisation remained high at 91% in the
September 2026 quarter, consistent QoQ despite a major planned shutdown, demonstrating the operation’s ability to maintain strong plant performance through a major shutdown period. - Mill throughput reached a new quarterly record and lithium recoveries averaged 70% for the
September 2026 quarter, in line with the previous quarter. - Spodumene concentrate production increased by 1% QoQ to 54,907 dry metric tonnes (dmt) at an average grade of 5.1%, with high mill utilisation, throughput and lithium recovery generating the second-best quarterly production performance on record.
- Spodumene sales were 58,134 dmt at an average realised selling price1 (FOB) of
US$1,276 /dmt (US$1,524 /dmt SC6), resulting in revenue ofUS$74 million . Unit operating costs per tonne sold (FOB) wereUS$780 /dmt, a 14% decrease compared toUS$907 in the prior quarter delivering an operating cash margin ofUS$476 /dmt sold. - Capital expenditure of
US$9 million for theSeptember 2026 quarter was related to various planned NAL sustaining capital projects and the NAL Expansion.
Growth Projects
NAL Expansion
- The NAL Expansion project moved into execution during the
September 2026 quarter, with detailed engineering, long-lead item procurement, installation activities and demolition of NAL’s legacy carbonate plant underway.
Moblan
- Fieldwork continued to document baseline environmental conditions to support associated permitting activities.
- Scoping study was commenced to evaluate plant sizing and project staging scenarios, built on the 2024 Moblan Definitive Feasibility Study.
Carolina Lithium
- Elevra continued to advance permitting for the integrated
Carolina Lithium Project , with a draft air permit issued for public comment by theNorth Carolina Division of Air Quality .
- Consistent with Elevra’s focus on capital management and developing its North American project portfolio, the Company completed the sale of its rights in tenement E45/2364 (
Tabba Tabba ) and announced a proposal to expand the Morella Lithium Joint Venture.
Corporate
- Shareholders approved all five resolutions at the Company’s Extraordinary General Meeting on
16 July 2026 , including the issuance of the Upfront Tranche of convertible notes toCanada Growth Fund (CGF)2. Following receipt of shareholder approval, Elevra subsequently issuedUS$46 million (C$65 million ) of convertible notes to CGF3. - Elevra executed a binding supply agreement with
Mangrove Lithium for spodumene concentrate produced at NAL. Pricing is market-based with a floor price ofUS$1,000 /t (SC6). The agreement is subject to satisfaction of certain conditions, including Mangrove securing financing and taking a Final Investment Decision for a conversion facility proposed to be developed inEastern Canada 4. - Subsequent to the end of the period, Elevra executed a binding spodumene concentrate supply agreement with LG Energy Solution for 240,000 dmt on
8 October 2026 5. - On
16 October 2026 , Elevra announced that its Board will reduce from 8 to 6 Directors following the conclusion of the 2026 Annual General Meeting (AGM), with Non-Executive DirectorsAllan Buckler andJorge Beristain to resign at the close of the meeting6. - On
26 October 2026 , Elevra completed the sale of its interests in theEwoyaa Project to Zhejiang Huayou Cobalt Co., Ltd. (Huayou ) for approximatelyUS$71 million in cash, further concentrating the portfolio inNorth America 7. - Cash at the end of the
September 2026 quarter wasUS$319 million , an increase ofUS$63 million fromJune 2026 reflecting the receipt of proceeds from the issuance of convertible notes and cash generated from operations. Net cash wasUS$240 million (June 2026 :US$200 million ), inclusive of the convertible note facility balance ofUS$46 million (June 2026 : Nil) and prepayment facility balance ofUS$33 million (June 2026 :US$55 million ). This balance does not include the Ewoyaa sale proceeds.
Management Commentary
The
At NAL, the team delivered record ore mined of 466,499 wmt and the mill processed 364,987 dmt, the first quarter in NAL’s history processing more than 360,000 dmt of ore. Mill utilisation remained above 90% despite a major planned concentrator shutdown. Concentrate production of 54,907 dmt was the second-highest quarter on record.
Concentrate sales of 58,134 dmt at an average realised selling price of
While operational performance was strong, safety performance did not meet our expectations with six recordable injuries during the September quarter. No common causal factor was identified and in response, NAL is reinforcing the fundamentals of effective safety management through increased coaching, visible leadership in the field and consistent application of critical risk controls.
Project development work accelerated at NAL, with the Expansion moving from planning into execution during the
Lithium prices were volatile during the
Taking a step back, pricing ended the
We remain confident in the outlook for lithium and Elevra is in a strong financial position with
Mr
Managing Director and CEO
Operational Financial Performance
| Unit | Q1 FY27 | Q4 FY26 | QoQ Variance | FY27 | FY26 | YoY Variance | |
| North American Lithium8 | |||||||
| Ore mined | wmt | 466,499 | 372,938 | 25% | 466,499 | 338,341 | 38% |
| Ore processed | dmt | 364,987 | 358,806 | 2% | 364,987 | 341,780 | 7% |
| Recovery | % | 70 | 71 | (1%) | 70 | 69 | 1% |
| Concentrate produced | dmt | 54,907 | 54,479 | 1% | 54,907 | 52,003 | 6% |
| Concentrate grade produced | % | 5.1 | 5.0 | 0.1% | 5.1 | 5.2 | (0.1%) |
| Concentrate sold | dmt | 58,134 | 33,977 | 71% | 58,134 | 25,975 | 124% |
| Average realised selling price (FOB)9 | US$/dmt | 1,276 | 921 | 39% | 1,276 | 784 | 63% |
| Revenue | US$M | 74 | 31 | 137% | 74 | 20 | 264% |
| Unit operating cost per tonne sold (FOB)10 | US$/dmt | 780 | 907 | (14%) | 780 | 818 | (5%) |
| Group | |||||||
| Cash balance | US$M | 319 | 255 | 25% | 319 | 98 | 225% |
| USD : CAD | $ | 1.40 | 1.38 | 1% | 1.40 | 1.38 | 2% |
| USD : AUD | $ | 1.42 | 1.41 | 0% | 1.42 | 1.53 | (7%) |
Health and Safety
Health and safety performance during the
In response, NAL is strengthening the fundamentals of safety management through increased coaching, visible field leadership, consistent application of critical risk controls and renewed emphasis on the tools available to workers and supervisors. These initiatives are focused on embedding consistent safety practices to maintain a culture of risk awareness, accountability, and operational excellence.
ESG and Community Engagement
Environmental studies associated with future stages of the NAL Expansion and development at Moblan progressed as planned.
Elevra continued to strengthen its relationships with local communities, stakeholders and government representatives across its operating and development hubs. These activities reflect Elevra’s continued focus on responsible environmental management, transparent communication and constructive relationships with the communities in which it operates and is developing projects.
North American Lithium
Mining
Ore mined of 466,499 wmt was 25% higher than the previous quarter.
Mining activity during the
The feed grade of ore delivered to the ROM stockpile averaged 1.08% Li2O for the
Production
Production increased to 54,907 dmt of spodumene concentrate at an average grade of 5.1% for the
The mill processed 364,987 tonnes of ore during the
Mill utilisation was 91%, the third consecutive quarter above 90%, despite a major planned shutdown which reduced availability in the second half of the quarter. Crushing plant performance continued to aid operational stability with 388,158 wmt crushed during the period.
The average feed grade increased to 1.10% Li2O in the
Sales
NAL revenue was
Revenue increased by 137% QoQ as a result of a 71% increase in spodumene concentrate tonnes sold and a 39% increase in the average realised selling price per tonne (FOB). Total spodumene concentrate tonnes sold during the
The average realised selling price (FOB) for the
The 39% QoQ increase in realised pricing reflects Elevra’s commercial strategy to link sales to market-based spodumene concentrate prices. Elevra’s future committed sales volumes will be priced on prevailing spodumene prices at the time of sale or post arrival at the port of discharge, depending upon the contract terms. This is expected to more accurately align realised prices with market prices.
Lithium prices were volatile during the
A total of 37,173 dmt of spodumene concentrate finished goods was stockpiled at NAL, in transit or at the port as at
Costs
Unit operating costs per tonne sold (FOB) decreased 14% quarter on quarter to
NAL production costs declined 2%, while the 25% increase in ore mined and sustained concentrate production of 55kt, up 1% QoQ, provided volume leverage across the operation, supporting lower inventory unit costs.
Total ore mining and waste stripping costs increased by 12% QoQ, consistent with the 12% increase in total material moved, this was offset by a 14% QoQ reduction in ore processing costs driven by improved crusher performance, plant reliability, maintenance and operational efficiencies.
Foreign exchange also contributed favourably, with a stronger US dollar relative to the Canadian dollar reducing reported costs by approximately
Growth Projects
NAL Brownfield Expansion
In
The PFS supports an increase in annual spodumene concentrate production from approximately 199 thousand tonnes per annum (ktpa) to 373ktpa following the expansion, 10% above the
The expansion will be delivered in three stages. Stage 1 lifts throughput to the permitted 4,500 tonnes per day (tpd) milling throughput rate for a 15-20% increase in annual spodumene production capacity. Stage 2 expands milling, flotation and filtration capacity to expand milling throughput to 6,500 tpd. Stage 3 adds a new permanent crushing circuit and enhanced ore sorting capacity aligned with the increased throughput to deliver the full cost and production benefits.
Development activities progressed during the
The NAL Brownfield Expansion remains on schedule, on budget and fully funded through the Strategic Financing Package announced in
Moblan
At the
Environmental fieldwork continued during the
Permitting remains the critical path for development and Elevra’s immediate priorities are centred on advancing baseline environmental studies and associated permitting activities.
We have commenced a Scoping Study, building on the 2024 Definitive Feasibility Study, to incorporate the project's expanded resource base and evaluate optimal plant sizing and staged development options. The Scoping Study is expected to be completed in the second quarter of FY27.
Carolina Lithium
During the
In
The Wildcat shares obtained from the sale of
Tenure and access matters affecting the Morella-Elevra JV’s
Also, in
These transactions are part of regular portfolio evaluation and optimisation as Elevra simplifies its corporate structure and reduces the cost of maintaining a standalone exploration capability, allowing the Company to focus capital and management attention on developing its North American portfolio of projects.
Corporate
Extraordinary General Meeting
On
A further
Binding Offtake Agreement with
In
Binding Offtake Agreement with LG Energy Solution
Subsequent to the end of the
2026 AGM and Board Transition
On
Sale of Ewoyaa Project Interest
Also in
Cash
Cash and cash equivalents increased by
NAL generated profit from operations of
Capital expenditure in the
The balance of the prepayment facility, which relates to advance payments based on the value of certain committed future sales of spodumene concentrate, was
The Group reported a net cash inflow of
Capital Structure
At
- 194,016,029 ordinary fully paid shares;
- 8,000,000 unquoted options expiring on
31 December 2028 (EX$4.80 ); - 56,678 unquoted options expiring on
12 May 2029 (EX$18.30 ); - 2,459,812 unquoted performance rights (expiring various dates).
- 65,000,000 convertible notes
Announcement authorised for release by the Board of Directors of
For more information, please contact:
Chief Development and Investor Relations Officer
Email: ir@elevra.com
Phone: +61 7 3369 7058
Information
The following information applies to this report:
- All references to dollars and cents are
United States currency, unless otherwise stated. - Numbers presented may not add up precisely to the totals provided due to rounding.
The following abbreviations may have been used throughout this report: cost, insurance and freight (CIF); dry metric tonne (dmt); earnings before interest and tax (EBIT); earnings before interest, tax, depreciation and amortisation (EBITDA); free on board (FOB); life of mine (LOM); lithium carbonate (Li2CO3); lithium hydroxide (LiOH); lithium oxide (Li2O); net present value (NPV); run of mine (ROM); thousand tonnes (kt); tonnes (t); and wet metric tonne (wmt).
Forward-Looking Statements
This report may contain certain forward-looking statements. Such statements are only predictions, based on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond Elevra Lithium Limited's control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking statement. The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled.
Elevra Lithium Limited undertakes no obligation to update any forward-looking statement or other statement to reflect events or circumstances after the date of this report (subject to securities exchange disclosure requirements).
The information in this report does not take into account the objectives, financial situation or particular needs of any person. Nothing contained in this report constitutes investment, legal, tax or other advice.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and all material assumptions and technical parameters continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcements.
About Elevra Lithium
Elevra Lithium Limited (ASX: ELV; NASDAQ: ELVR) is North America's largest hard-rock lithium producer with a diversified portfolio of high-quality assets across Québec (Canada) and the United States.
Our flagship operation, the North American Lithium (NAL) mine in Québec, Canada has successfully ramped up production of spodumene concentrate, supported by ongoing operational enhancements to increase recovery rates, throughput, and mill utilisation. Following a Mineral Resource upgrade, Elevra completed a Pre-Feasibility Study for a brownfield expansion to increase NAL’s annual spodumene concentrate production and reduce unit operating costs.
Complementing NAL, the Moblan Lithium Project in central Québec represents one of the largest undeveloped spodumene resources in North America, with a Mineral Resource of 121 Mt @ 1.19% Li2O. Development activities are progressing with feasibility studies targeting a large-scale, long-life operation capable of supplying both domestic and international markets.
Meanwhile, in the United States, our Carolina Lithium Project offers a strategic foothold in a market that is highly reliant upon imports of lithium products.
Looking ahead, Elevra is focused on strategic downstream partnerships to enable further value-added lithium production, positioning the Company to deliver a secure, sustainable supply of critical minerals to global customers. Together, these assets establish Elevra as a growth-focused supplier supporting the global energy transition.
For more information, please visit us at www.elevra.com.
______________________________________________
1 The average realised selling price of US$1,276/dmt (FOB) was estimated with reference to spot price indices at 30 September 2026. The final pricing for these shipments will settle in the December Quarter and may be higher or lower than the estimated realised price.
2 ASX release 16 July 2026 “Results of 2026 Extraordinary General Meeting”.
3 ASX release 3 August 2026 “Issuance of Upfront Tranche of Convertible Notes”.
4 ASX release 21 August 2026 “Binding Agreement concluded with Mangrove Lithium.”
5 ASX release 8 October 2026 “Spodumene Supply Agreement signed with LG Energy Solution”.
6 ASX release 16 October 2026 “Planned Board Transition Announced”.
7 ASX release 26 October 2026 “Sale of Ewoyaa Interest Completed”.
8 Numbers presented may not add up precisely to the totals provided due to rounding.
9 Average realised selling price is calculated on an accruals basis and reported in US$/dmt sold, FOB Port of Québec (to July 2026) or Trois-Rivières (July 2026 onwards).
10 Unit operating cost per tonne sold is calculated on an accruals basis and includes mining, processing, transport, port charges, site-based general and administration costs and cash based inventory movements, and excludes depreciation and amortisation charges, freight and royalties. It is reported in US$/dmt sold, FOB Port of Québec (to July 2026) or Trois-Rivières (July 2026 onwards).
11 ASX release 7 September 2026 “NAL Expansion Pre-Feasibility Study”.
12 ASX release 12 May 2026 “Updated NAL Expansion Scoping Study Defines Faster Growth and Lower Costs”.
13 ASX release 29 June 2026 “NAL Expansion Update”.
14 ASX release 12 May 2026 “Transformational Financing Package to Accelerate Growth”.
15 ASX release 7 August 2026 “Elevra Completes Sale of E45/2364 Pegmatite Rights”.
16 ASX release 20 August 2026 “Proposal to Expand Morella Joint Venture”.
17 ASX release 16 July 2026 “Results of 2026 Extraordinary General Meeting”.
18 ASX release 3 August 2026 “Issuance of Upfront Tranche of Convertible Notes”.
19 ASX release 21 August 2026 “Binding Agreement concluded with Mangrove Lithium”.
20 ASX release 8 October 2026 “Spodumene Supply Agreement signed with LG Energy Solution”.
21 ASX release 16 October 2026 “2026 Notice of Annual General Meeting & Proxy Form”.
22 ASX release 16 October 2026 “Planned Board Transition Announced”.
23 ASX release 26 October 2026 “Sale of Ewoyaa Interest Completed”.
24 Net cash is equal to the balance of cash and cash equivalents less the balance of the convertible note facility and prepayment facility.
Source: Elevra Lithium Limited