Test Results Highlights
- Analyzed 85 samples contain up to 42% spodumene;
- Sample grades range from 0.02% to 3.71% Li2O and from 0.36% to 6.30% Fe2O3;
- Spodumene is the only identified lithiferous mineral and the intercepted pegmatite is free of impurities, suggesting the potential for producing lithium concentrates suitable for manufacturing lithium carbonate and lithium hydroxide for batteries; and
- Tests carried out demonstrated the feasibility of producing a Direct Shipping Ore (“DSO”) concentrate grading 6.024% Li2O5 while recovering 76.66% of the lithium in 22.97% of the mass, through a single Dense Media Separation (“DMS”) step applied to the coarsest crushed feed. This result is very promising and suggests a selective exploration and mining approach.
“We are very encouraged by the strong metallurgical results achieved, which demonstrate the potential of the mineralization to respond well to conventional processing methods,” commented
“The results obtained clearly support the use of DMS on crushed high-grade ore to be potentially sourced from the Ninaaskumuwin lithium discovery and to produce a DSO marketable Spodumene Concentrate (SC6). The quality of the intercepted LCT pegmatite indicates that the processing of the mineralized material as highly derisked. This is in sharp contrast with other hard rock lithium projects that are challenged to produce profitable and marketable concentrates.” stated
The Ninaaskumuwin lithium prospect is located on Fury’s 100% owned Elmer East project, which covers approximately 45,700 hectares. Ninaaskumuwin is easily accessible from the paved Billy Diamond highway, approximately 60 kilometres (km) north of the ‘km 381’ rest stop where accommodation, catering, fuel, and power are available. The discovery sits approximately 50 km north of

Figure 1: Elmer East Location Map
To carry out the metallurgical test work financial assistance was provided by the ministère des Ressources naturelles et des Forêts (MRNF). This financial support was granted as part of the fourth call for projects of the
Mineralogical analysis and metallurgical tests were conducted by IGS, in their laboratory in
About
For more information on
| For further information on | |
| Tel: | (844) 601-0841 |
| Email: | info@furygoldmines.com |
| Website: | www.furygoldmines.com |
Forward-Looking Statements and Additional Cautionary Language
This news release includes certain statements that may be deemed to be “forward-looking statements” within the meaning of applicable securities laws, which statements relate to the future exploration operations of the Company and may include other statements that are not historical facts. Specific forward-looking statements contained in this news release includes information relating to the Company’s ongoing exploration program at the Elmer East project.
Although the Company believes that the assumptions and expectations reflected in those forward-looking statements were reasonable at the time such statements were made, there can be no certainty that such assumptions and expectations will prove to be materially correct. Mineral exploration is a high-risk enterprise.
Readers should refer to the risks discussed in the Company’s Annual Information Form and MD&A for the year ended
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/d18bc418-62a1-457f-b0af-e33f22a68aef
Source: 